Do not let the successful fit photo lose its bottle reference
This is a worked planning example, not a completed test, customer record, legal approval or universal acceptance standard. Replace every demonstration reference with your own project input. Keep unknown items on hold with a named owner.
| linked record | example entry | owner | what a change reopens | release status |
|---|---|---|---|---|
| Container | Sample T-A; supplier item reference to attach | Purchasing | Profile and boundary measurements | Identify actual production sample |
| Application zone | Marked upper/lower boundaries and position photo | Packaging owner | Fit even if nominal capacity stays the same | Review at actual position |
| Outline | Trial cut revision D02 | Converter | Cut geometry and safe areas | Paper and material trials required |
| Artwork | Design A on accepted D02 | Designer and approver | Panel layout and final-size reading | Do not adapt family before acceptance |
Use the record
Identify your container, artwork and proposed specification. Keep evidence references beside decisions. The responsible buyer and supplier should agree the conditions and approval scope; example rows are instructions, not pass results. Retain revisions when an input changes.