Using the placement-window record

Fictional planning example. No production measurement, supplier promise or approval is supplied.

  1. Keep the unaltered example separate. Replace DEMO identities with the actual vial, artwork and sample references.
  2. Identify the owner and source for every proposed input. The arithmetic uses one base datum and millimeters. Upper boundary minus label height gives the geometric maximum bottom position; process allowances and visibility constraints still require review.
  3. Agree the actual sample scope, observation method and criteria with the buyer, converter and application owner. Leave unavailable observations blank.
  4. Record the actual evidence, responsible decision and remaining hold. PENDING is not a pass and the example is not an acceptance standard.

Read the full purchasing guide · Discuss the project with RP Labels